Day Scheduler

Waits until the specified trigger time elapses, then passes control to the next downstream Node.

Version History

3.0.0.0 Times are now based on Time Zone specified in Site Detail Pane
3.0.0.4 Changed scheduler to only fire at the times it should, not as soon as the workflow start and x minutes after that.

Properties

StartTime

Type: DateTime Input
The start of the time window which the scheduler will be active for.

EndTime

Type: DateTime Input
The end of the time window which the scheduler will be active for.

IntervalMinutes

Type: Int32 Input
The interval in minutes at which the scheduler should fire.

Remarks

The Day Scheduler allows tasks to be scheduled to execute within a specific time window at a specified interval. The scheduler should be connected to the Start output of the Start Node.

StartTime and EndTime are local times for the Time Zone set in Site Detail Pane.

See Also

Week Scheduler

Month Scheduler