Month Scheduler

Waits until the specified trigger time elapses on the specified day of the month, then passes control to the next downstream Node.

Version History

3.0.0.0 Times are now based on Time Zone specified in Site Detail Pane.
3.0.0.4 Changed scheduler to only fire at the times it should, not as soon as the workflow start and x minutes after that.
3.1.0.0 Added overnight support.

Properties

DayOfMonth

Type: List Input
The day of the month on which the trigger fires. LastDay is represents the final day of the current month, regardless of month length.

1 through 31
LastDay

StartTime

Type: DateTime Input
The start of the time window which the Scheduler will be active for.

EndTime

Type: DateTime Input
The end of the time window which the Scheduler will be active for.

IntervalMinutes

Type: Int32 Input
The interval in minutes at which the Scheduler should fire.

Remarks

The Week Scheduler allows you to trigger Workflows to execute at a set interval within a daily window, on a specific day of the month. The Scheduler should be connected to the Start output of the Start Node.

StartTime and EndTime are local times for the Time Zone set in Site Detail Pane.

To run overnight, set EndTime before StartTime. The window will correctly span midnight and fire on-interval across the boundary, anchored to specified day of the month. This behavior matches the Day Scheduler.

See Also

Day Scheduler
Week Scheduler